本工程供电方案 1份 2010-2-25
Power supply scheme of this project 1 25 February, 2010
用电负荷资料 1份 2010-2-25
by the employer
Electricity load data 1 25 February, 2010
第六条 设计人向发包人交付的设计文件、份数、地点及时间
Article 6 Documents, number of copies, location and time submitted to the employer by the designer
设计图纸 8份 2010-04-15
Design drawing 8 copies 15 April, 2010
概算书 6份 2010-04-15
Book of estimates 6 copies 15 April, 2010
注:待发包人结清全部设计费后,由设计人将设计文件交付沈阳供电公司客户工程部
Note: After the party issuing contract settles up the total design fee, the above design documents will be submitted to the Project Division of Shenyang Power Supply Company by the designer.