变电所设计合同

2015-07-16 16:10:57 变电所设计合同设计合同

  If it exceeds the prescribed time limit within fifteen (15) days when the employer delivers above materials and documents, the designer can postpone accordingly the time of delivering the design documents in accordance with Article 6 in the Contract; if it exceeds the prescribed time limit over fifteen (15) days when the employer delivers above materials and documents, the designer is entitled to decide again the time of delivery of design documents.

  9.1.2发包人变更委托设计项目、规模、条件或因提交的资料错误,或所提交资料作较大修改,以致造成设计人设计返工时,双方除另行协商签订补充协议(或另订合同)、重新明确有关条款外,发包人应按设计人所耗工作量向设计人支付返工费。

  9.1.2 When the employer alters entrusted design items, scale and conditions, or delivers the wrong materials, or delivers mostly revised materials so that the designer rework for the design, the employer shall pay for rework cost for the designer based on the amount of the work performed by the designer except the supplemental agreement (or contract ) signed separately, and the relevant articles specified again by both parties through the consultation.

分享

热门关注

平面设计合同范本最新版

关于平面设计合同范本

室内设计合同范本最新版

设计合同范本最新版

2021平面设计合同范本简单

平面设计合同简单

2021建筑设计合同标准范本

设计合同标准

室内设计合同范本简洁

设计合同范本

工程设计合同模板

设计合同

室内装修设计合同模板

装修设计合同

室内装修工程设计合同

设计装修合同

2021建设工程设计合同模板

建设设计合同

建筑工程设计合同模板

工程设计合同